Short Lead Time for Prototype Plastic - Chair plastic cushion – Chapman

Short Description:


Product Detail

Related Video

Feedback (2)

Our business promises all users of the first-class items and the most satisfying post-sale company. We warmly welcome our regular and new prospects to join us for 3d Printing Injection Molds, Machining, Auto Parts-Germany, We are going to provide most effective quality, quite possibly the most current market aggressive rate, for each and every new and outdated consumers with the most great environmentally friendly solutions.
Short Lead Time for Prototype Plastic - Chair plastic cushion – Chapman Detail:

Mould NO. CPM-150236
Surface Finish Process VDI-33
Plastic Material PP+20GF
Part weight 1860g
Design Software UG
Part size 520*370*410 mm
Customized Customized
Application Appliances
Mould size 800 * 500 * 561mm

 

Part Name Chair plastic cushion
Mould Cavity 1*1
Runner  point gate
Standard LKM
Mould Material NAK80/P20
Mould Life Cycle 500,000
Lead Time 42 days
Mould Cycle Time: 42′s
Payment T T

Application field

The design of this kind of stool is perfect. The curved design of the seat cushion ensures that the sitting posture is upright, and it will not feel tired for a long time. Generally, our chair is used in large conferences and offices.

The frame of the stool is designed and manufactured by stainless steel pipe, with a bearing strength of 300 kg. The foot pad is made of rubber pad, which reduces noise during the movement.

The shape adopts a curved design style, which makes the entire office look generous and tidy.

Project Management

We have 12 Design Engineers with an average of 10 years design experience and a technical college level of education. The team will discuss every new project together and find the perfect solution for it, based on our knowledge and successful experience. We use 3D software to design the mold and Moldflow to verify and optimize the design, so that we can ensure it’s success.

After receiving your PO and part print, we will discuss and recommend any changes we think are necessary to make the part mouldable. We will then provide you with a DFM design report within two days to one week for you to review. We will discuss and then submit the part demoulding method and finalized mould design for your approval, before purchasing and cutting the steel. This process guarantees that we fulfill all of your design requirements.

asfg

Mould Workshop


Medical-(7)
Medical-(9)
Medical-(11)
Medical-(12)
Medical-(13)

Customer visit

Creating value for customers and making it perfect is our philosophy. You will realize greater profits by working together with CPM!




Medical-(3)
Medical-(10)
Medical-(8)

Mould standard

We are experienced in all kinds of steels and fittings of international standard

Medical-(16)

Packaging&Warehousing

cshvjxckv


Product detail pictures:

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures

Short Lead Time for Prototype Plastic - Chair plastic cushion  – Chapman detail pictures


Related Product Guide:

With a sound business credit, excellent after-sales service and modern manufacturing facilities, we have earned an excellent reputation among our customers across the world for Short Lead Time for Prototype Plastic - Chair plastic cushion – Chapman , The product will supply to all over the world, such as: Hungary, Ghana, New Delhi, We have been in operation for more than 10 years. We are dedicated to quality products and consumer support. We currently own 27 product utility and design patents. We invite you to visit our company for a personalized tour and advanced business guidance.
  • This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Edwina from Slovenia - 2018.12.11 14:13
    The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Emma from Germany - 2017.12.19 11:10
    Write your message here and send it to us